The arena construction is progressing, with all the pipe posts in and the top rail on (Merry Christmas to me!) Next is welding the clips to run the cable through, and finally to hang the gates. After Christmas next week we will be hauling in the sand to give us that good, safe arena footing. The 50-foot round pen will be set up as soon as the sand gets here.The electrician is here today adding more lighting in the barn.
The forms are set now and ready to pour the concrete for the wash rack. Can't wait for warmer weather to put it to use.
The forms are set now and ready to pour the concrete for the wash rack. Can't wait for warmer weather to put it to use.